Skip to content

zed-industries/aabb

Star momentum, maintenance concentration, contributor health, and codebase change — one report built from public repository data.

Open on GitHub
Current stars
5
Activity since
2024
Latest activity
Dec 2024

Public star activity

Last 30 days
+2
Last 90 days
+2
Actions / day
0.0
Public star actions

stars from February 24, 2024 to December 15, 2024, peaking at 4.4 STARS10 MO4DEC 2024FEB 2024

4 stars on December 15, 2024.

stars by date
Datestars
February 24, 20241
June 28, 20242
December 5, 20243
December 15, 20244

The last 90 days run ahead of this repository's lifetime average.

The commit history reads zed-industries/aabb a second time

methodology

Fix-labelled changes, file change frequency, ownership concentration and maintenance cadence, each computed from this repository's analyzed commit window. None of them is derived from stars, which is why they are allowed to disagree with the curve above.

Fix-labelled changes
Fix-labelled changes for zed-industries/aabb
File change frequency
File change frequency for zed-industries/aabb
Bus factor
Bus factor for zed-industries/aabb
Maintenance pulse
Maintenance pulse for zed-industries/aabb
Contributors
Contributors for zed-industries/aabb
Language activity
Language activity for zed-industries/aabb
Commit activity
Commit activity for zed-industries/aabb
Recent TODO/FIXME movement
Recent TODO/FIXME movement for zed-industries/aabb

Attention is not adoption.

Stars against usage

No published package was detected for this repository, so there is nothing to lay over star growth.

Earned badges

badge studio

Maintenance, ownership and star-momentum signals, computed from the same commit and star history and embeddable as static images.

Reading badge evidence for zed-industries/aabb.

Notes on zed-industries/aabb

How many stars does zed-industries/aabb have?
GitHub currently reports 5 stars for zed-industries/aabb. The chart itself is rebuilt from historical star data, which records star actions and not unstars, so it reads as an attention signal rather than a net star count.
What does recent star activity look like for aabb?
gitdebt observed about 2 public star actions for zed-industries/aabb over the latest 90 days of archive coverage (about 2 in the latest 30). This is an approximate attention signal, not a net-star count, because unstars are not present. That's faster than its lifetime average activity pace.
Is aabb still active?
Public archive data shows about 2 star actions for zed-industries/aabb in the latest 30 days of coverage. For repository activity, use the commit heatmap, commit trend, and contributor charts on this page.
When was aabb created?
zed-industries/aabb was created on February 23, 2024. The first public star activity observed for zed-industries/aabb is from Feb 2024.

Put this drawing in your README

markdown for agents

The block below publishes the chart with its source and coverage date stated beside it — the same three facts the title block above shows, as text a reader can check. The prompt underneath hands a coding agent the badges and repo-health charts as well.

README.md · zed-industries/aabb star history
<a href="https://gitdebt.com/zed-industries/aabb?ref=readme">
  <picture>
    <source media="(prefers-color-scheme: dark)" srcset="https://api.gitdebt.com/api/repos/zed-industries/aabb/chart.svg?theme=dark" />
    <img alt="zed-industries/aabb star history" src="https://api.gitdebt.com/api/repos/zed-industries/aabb/chart.svg?theme=light" />
  </picture>
</a>

<sub>Star history source: Historical star data · Covers through December 15, 2024 · Still updating — <a href="https://gitdebt.com/zed-industries/aabb?ref=readme">gitdebt</a></sub>

Light and dark variants, alt text, and one provenance line. Provenance is text in your README, never baked into the image URL, so the chart stays cacheable.

Paste it into Claude Code, Cursor, Codex, or any coding agent with your checkout open. It carries the measured numbers, the exact snippets, and the rules — including replacing an existing star-history widget in place rather than stacking a second chart under it.